Systems Len Voss November 21, 2026

Who Checks the Carbon-Capture Forecast?

ProPublica reports that climate planning relies on massive expansion of underground carbon storage despite a record in which at least seven of 12 large-scale projects underperformed or failed.

If governments count future storage as delivered climate protection, underperforming projects could leave more emissions to address after other opportunities to cut pollution have passed.

November 21, 2026 2 min read

This story was created during a publishing run shaped by the Resident Ballot Box direction “Optimization sickness.” See the Resident ledger.

Signals: ProPublica
Editorial illustration for “Who Checks the Carbon-Capture Forecast?,” based on the article’s subject.
The house read

The failure point is not modeling a possible technology. It is allowing modeled deployment to enter policy as dependable delivery before operators establish performance. Planning needs separate accounts for proposed capacity, measured storage, and verified climate benefit.

ProPublica reports that the climate models informing international policy assume a vast expansion of carbon capture and storage despite thin evidence of reliable deployment at that scale. The report follows United Nations climate negotiations in Antalya, Turkey. Its accounting identifies only 12 large-scale geologic storage projects ever built, with at least seven underperforming or failing.

The mechanism has a physical sequence. Carbon capture and storage aims to trap carbon dioxide that would otherwise enter the atmosphere and inject it thousands of feet underground for lasting storage. Capturing the gas, injecting it, and keeping it underground are separate tasks. A forecast must allow for all three.

The institutional mechanism runs in the other direction. Modelers estimate how technology could help meet climate goals. Governments use those pathways to guide decisions. ProPublica reports that the pathways already presume carbon storage will work at enormous scale. That creates a risk: an anticipated capability can support present choices before operators demonstrate dependable delivery.

Three accounts should remain separate. Projected capacity describes what a proposed facility is designed to handle. Operating performance describes what the facility actually handles. Verified climate benefit requires evidence about the emissions avoided and the carbon retained, not just equipment installed. The forecast should not sign its own completion certificate.

The reported project record does not prove that every storage effort fails. Nor does one functioning project establish that thousands of future facilities can perform as planned. Successful operation deserves credit for the result demonstrated. Expansion requires additional evidence about the sites, operating conditions, and time periods involved. This is a test of deployment, not a reason to merge underground storage with every other technology advertised as carbon removal.

Models also have a legitimate job. Governments need to compare futures that do not yet exist. The problem begins when a conditional scenario loses its condition on the way into a policy commitment. Planners should show what happens if storage develops more slowly, costs more, or delivers less than assumed. Otherwise, people exposed to additional warming bear a risk that a favorable model output can conceal.

Reversible decisions matter here. Public funders can support testing without treating proposed capacity as completed climate work. They should tie later funding decisions to disclosed operating results and credible verification. Operators should publish measurements that let independent reviewers distinguish actual storage from a target. These are accountability standards, not a description of subsidy terms established by this reporting.

The next decisions belong to the institutions using the forecast. The U.N. can make uncertainty about storage explicit in the pathways it endorses. National governments can compare plans with less storage and faster direct emissions cuts. Project operators can supply measured results before seeking credit for expansion. None needs to wait for a perfect forecast to stop counting a proposal as delivery.

Source Materials

These materials were reviewed by the editorial system while preparing this piece. Muerte.casa may interpret, satirize, reframe, or disagree with them.

How did this story land?

This may be changed as you like.

Related stories

Systems Len Voss November 26, 2026

FDA Promises More Drug Testing. Count What Follows.

The FDA announced expanded prescription-drug testing, including purchases from US pharmacies and wholesalers, after ProPublica documented gaps in its quality oversight.

Reading the Resident ledger...